Change Orders and Special Projects

How we scope, price, and execute special projects like relabeling, rework, and mid-stream packaging changes

Client logos
100% Order Accuracy Guarantee
4 Hours Fulfillment Window
20% Management Margin
What We Control

Special Project Control Framework

Custom Order Handling

Every custom order is processed with precision and tailored to specific client needs before fulfillment.

Dynamic Staffing

Adjust workforce allocations rapidly to accommodate project-specific demands and maintain service levels.

Flexible Systems

Our systems adapt to project requirements, ensuring seamless integration with various ecommerce platforms.

Proactive Communication

Regular updates and checkpoints keep clients informed and projects on track at every stage.

How It Runs

Special Project Execution Sequence

01

Initiate

Identify project scope, timelines, and specific requirements during initial consultations.

02

Plan

Develop a detailed execution plan including resource allocation and timeline management.

03

Execute

Deploy resources and systems to execute the project with stringent adherence to quality controls.

04

Review

Conduct post-project audits to identify successes and areas for improvement for future projects.

Cost & Control

Transparent Special Project Costs

Detailed Cost Structure

Gain full visibility with a cost-plus model that includes every line item for complete transparency.

Tailored Pricing

Pricing customized to fit the unique needs of each project, ensuring competitive and fair rates.

Efficiency Audits

Regular audits ensure processes are cost-effective and project resources are optimized.

Outcome-Driven Improvements

Feedback from each project is used to refine pricing strategies and operational efficiencies.

Is Your Next Project In Good Hands?

Results That Ship

Case Studies

100% Order Accuracy

Hardcover journal fulfillment with lot-level tracking per print run, optimized void-fill packaging, and transparent cost-plus pricing.

Read case study →
0 Product Damage

Fragile grooming products shipped in right-sized cartons with labor-based billing and same-day promotional kit assembly.

Read case study →
FEFO Lot Rotation

Supplement fulfillment with lot and expiration tracking, multi-channel barcode control, and EDI compliance for iHerb.

Read case study →
0 Kitting Errors

Microbiome testing kits with 5–30 components assembled via barcode-validated scanning and linked return tracking.

Read case study →
100+ Active SKUs

PPE and air filtration fulfillment with barcode-validated picking across 100+ SKUs, brand-specific QC, and packaging engineering.

Read case study →
100% QR Attribution

Luxury direct mail with serialized QR codes, white-glove kitting, and temperature-controlled material storage.

Read case study →
30% Shipping Savings

Subscription HVAC filter fulfillment with DIM-weight optimization, SKU complexity management, and carrier negotiation.

Read case study →
0 Breakage Rate

Premium Shabbat kits with fragile glass handling, gift-ready presentation standards, and founder-led quality control.

Read case study →
Mon–Wed Ship Days

Cold-chain lab supply fulfillment with ship-day rules, temperature-controlled packaging, and next-day carrier optimization.

Read case study →
FDA Registered Facility

ASTM Level 3 PPE distribution with lot-level traceability, compliant documentation, and multi-channel fulfillment.

Read case study →
0 Assembly Errors

TIME Best Inventions respirator with multi-component kit assembly, component-level inventory, and configuration validation.

Read case study →
500+ Addresses/Campaign

Y Combinator-backed corporate gifting with multi-address batch processing, personalization accuracy, and holiday surge capacity.

Read case study →